| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | HongCe |
| Model Number : | DL-30 |
| Certification : | Calibration certificate(cost additional) |
| Price : | Negotiation |
| Payment Terms : | T/T |
| Supply Ability : | 1 Sets per month |
| Delivery Time : | 40 days |
IEC 61869-2 Current Transformer Testing Equipment For Ratio Error And Phase Displacement Test
Product application:
The Current Transformer Testing Equipment is used for Measuring the ratio error and phase displacement of current transformers.
Standard:
IEC 61869-2 Instrument transformers - Part 2: Additional requirements for current transformers
Current Transformer Testing Equipment configuration:
Current transformer tester, the product is composed of transformer calibrator, standard current transformer , current transformer load box, current booster and control device.
| No. | Item | Specification | Qty. |
| 1 | Transformer calibrator | 2.0 | 1 set |
| 2 | Current transformer load box | 5A, 1A | 1 set |
| 3 | Standard current transformer | 5-10000A/5A, 1A; 0.02S level | 1 set |
| 4 | Current booster | 0-5000A,20KVA | 2 sets |
| 5 | Control device | 40KVA | 1 set |
| 6 | High current wire | 2000A*3m*6 pieces 1000A*3m*1piece 500A*3m*2 pieces 250A*3m*2 pieces 100A*3m*2 pieces | 1 set |
| 7 | Secondary current voltage line | 1 set |
Features:
Accuracy (angular difference, ratio difference) test, secondary open circuit test;
Multi-testing at one time, automatic line change, range change;
Automatic identification of wiring errors, give sound and light alarm, and guide the abnormal position;
Especially suitable for CT, PT factory test, 2 minutes to complete the accuracy test of 12 CTs;
Customized output report format, results can be uploaded to the manufacturer's ERP system;
Good safety and high test efficiency;
Internal picture of equipment:

|